Specifications include, but are not limited to: This project will include the demolition of the existing building additions, renovation of approximately 65,000 GSF of the original building, and a 64,000 GSF addition. The project will include 29,000 assignable square feet of student and maker space that will include capstone projects, maker space and shops, machine shop, student organizations, and meeting and presentation spaces. It will also include 32,000 assignable square feet of biomedical cross-disciplinary space to include biomedical engineering research labs, and offices; cross-disciplinary biomedical research labs and faculty offices for computer science, chemical and materials engineering, mechanical and aerospace engineering, and electrical and computer engineering. In addition to the work noted above, accessibility issues at the main entrance of the building will be addressed as part of the scope of this project.