Specifications include, but are not limited to: The CONTRACTOR shall remove specified awnings from the Wilcox Building. The awnings are old and in poor condition. Several of the awnings have already fallen down due to wind damage. Awnings are located on the second and third floor of the building. Awnings are located on all four sides of the building. Prior to work being performed the CONTRACTOR shall test awnings for lead paint. If lead paint is present proper legal protocol must be followed for removal and disposal. 1.1 The CONTRACTOR shall have an office on the island of Oahu from where the CONTRACTOR conducts business and be accessible to telephone calls for complaints or requests that need immediate attention. The CONTRACTOR shall be able to respond verbally within two (2) hours from the STATE’s call/request. 1.2 The CONTRACTOR shall furnish all labor, supervision and equipment including but not limited to power tools, scaffolding, etc. 1.3 The CONTRACTOR shall Perform all services in a safe and efficient manner. The CONTRACTOR shall employ best practices in providing services as specified herein. The CONTRACTOR shall further assure that the performance of work specified herein is to the STATE’s full satisfaction and shall be in complete compliance with any applicable rules and regulations of all STATE, and local government agencies. 1.4 The CONTRACTOR shall be responsible for cleaning up the work site daily and at completion of project