Specifications include, but are not limited to: The proposed scope of work for a Fayetteville Middle School and/or Junior High School is as follows: ● Create a space with student and teacher needs and student learning as the first priority. ● Perform and provide top-quality pre-construction services that include value engineering, constructability reviews, cost estimating, scheduling, collaboration with the design consultants, logistics and phasing, site investigation and destructive testing, and assistance in selecting building materials and systems. ● Utilize and provide integrated construction technology including virtual design and construction. ● Aid in the establishment and achievement of high-performance construction and design goals. ● Aid in the feasibility of a Net Zero Building, including exploring the feasibility of ICF (Insulated Concrete Forms) construction. ● Manage and solicit subcontractor and supplier bidding. ● Ensure the delivery of the highest quality project, through top-notch construction services that ensure safety is the highest priority. ● Provide a project that is on time and under budget