Specifications include, but are not limited to: Municipal wastewater treatment facility to be upgraded to 325,000 gpd capacity to provide treatment via sequential batch reactor process. Project to include construction of a new headworks structure equipped with rotary fine screen, SBR controls, and sludge pumps, construction of two-cell sequential batch reactor equipped with mixer, air diffusion system, pre-equalization basin, post-equalization basin, and all associated appurtenances, Construction of a new structure to house ultraviolet disinfection system, tertiary filter system, aeration blowers, and chemical feed system, Construction of process support infrastructure including a new Control Building, emergency generator, process water system, and in-plant pump station.