Specifications include, but are not limited to: : Utah Tech University is seeking a vendor who can provide a turnkey operation for an upcoming elevator installation project. To learn more about the specifications of the project, please review the attached documents. Controller: Install microprocessor, simplex, selective collective automatic controller Machines: MRL traction, utilizing the machine room adjacent to the hoistway, Motor Controller: AC variable voltage controller. Car Doors: Install #4 finish stainless steel car doors. Hall Doors: Install #4 finish stainless steel hall doors. Entrances Install #4 finish stainless steel entrances. Door Operation: New/High Speed, Linear Door Operator with the necessary door hangers, door track, interlocks, and door closer. Buffers: Install code compliant buffer. Governor Install code compliant governor. Door protection Install an electronic safety edge. Signal Fixtures: Install LED Illumination Contractor’s Vandal Resistant Assembly.