Specifications include, but are not limited to: The extent of the project is as follows: River Road Lift Station: Construction of a new lift station consisting of precast concrete wet well, valve and meter vault, new submersible pumps, piping, valves, flow meter, force main, new electrical power and control equipment, site work, and other work as indicated in the drawings and specifications. On the Green Lift Station: Construction of a new lift station consisting of precast concrete wet well, valve vault, and meter vault, new submersible pumps, piping, valves, flow meter, force main, new electrical power and control equipment, site work, and other work as indicated in the drawings and specifications. Bids will be received for a single prime Contract. Bids shall be on a lump sum basis, as indicated in the Bid Form.