Specifications include, but are not limited to: This work shall include all costs involved in providing new and/or modifying existing electrical distribution as indicated and any costs involved with any other special controls for the project. Without limiting the work required under this specification section, the following is included at the sites, as noted: 1. Provide all conduit and wire for modified power distribution. 2. Provide new distribution panel board and all associated wiring at Thayer Building. 3. Removal of any existing discontinued exposed conduit and wiring. NOTE: It is planned that the existing conduits will be reused with necessary modifications for connections to the new panel board. 4. Any and all work required to leave the facility as a fully operable project per the contract. 5. Obtain and pay for all required permits, inspections, etc. 6. Provide any testing and commissioning for the project.