Specifications include, but are not limited to: A description of the work of this project can be summarized to include Crack Sealing existing asphalt parking lot and drive aisles from 21st Avenue extending into the site and stopping at the beginning of the fire lane loop road at the north and south-central portion of the site. Installation and maintenance of erosion control measures, cleaning parking lot and drive aisles and pedestrian/traffic control. Bid alternates to cover seal coating and re-striping of the existing parking lots and drive aisles within the project limits as well as maintenance of installed erosion control measures. Accessible parking retrofits including signage updates and installation of detectable warning strips are included with the bid alternates.