Specifications include, but are not limited to: 30.1.Vendor shall supply all labor, tools, transportation, materials, equipment and permits as necessary and required to perform services as described herein. 30.2.Except as otherwise provided in this Scope of Services, all services performed under any contract resulting from this solicitation shall be performed between the hours of 8:00 A.M. and 4:00 P.M, Monday through Friday. unless other arrangements are made in advance with the State. Any deviation in work hours shall be pre-approved by the Contracting Officer. The State requires ten-day advance knowledge of said work schedules to provide security and access to respective work areas. No premium charges shall be paid for any off-hour work. 30.3. Floor substrate shall be prepared as required by the manufacturer to ensure compliance with warranty requirements for all floor and base materials. Moisture testing shall be provided as required by manufacturer and compliance certificate shall be submitted to Owner before material installation begins. 30.4.Installation shall be in full compliance with manufacturer's recommended installation requirements. Upon completion of the work, the area of installation shall be left clean and ready for use. The completed installation shall be thoroughly vacuumed, with all rubbish removed from the site by the installer. The Vendor shall not commence work until a conference is held with the State agency intending to utilize the Vendor’s services, at which representatives of the Vendor and the State are present. The conference shall be arranged by the State agency. 30.5.The State shall require correction of any defective work and the repair of any damage to any part of a building, or its appurtenances caused by the Vendor or its employees, subcontractors, equipment, or supplies. The Vendor shall correct, repair, or replace all defective work, as needed, to complete said work in satisfactory condition, and the Vendor shall repair all damage so caused in order to restore the building and its appurtenances to their previous condition. Upon failure of the Vendor to proceed promptly with the necessary corrections or repairs, the State may withhold any amount necessary to correct all defective work or repair all damage from payments to the Vendor. 30.6.The work staff shall consist of qualified persons completely familiar with the products and equipment that they will use. The Contracting Officer may require the Vendor to dismiss from the work such employees as the Contracting Officer deems incompetent, careless, insubordinate, or otherwise objectionable, or whose continued employment on the work is deemed to be contrary to the public interest or inconsistent with the best interest of security and the State. 30.7.Neither the Vendor nor its employees or subcontractors shall represent themselves as employees or agents of the State.