Specifications include, but are not limited to: 1. The work involves removing all designated roofing materials, obsolete units and other related items. 2. All of the membrane, flashings, coverboard and insulation shall be removed in its entirety down to the structural Cementitious Wood Fiber decking. 3. The existing structural cementitious wood fiber decking will be inspected and repaired on a unit price basis (Base bid quantity with additional ADD/DEDUCT pricing). 4. The perimeter wood blocking will be inspected and, if necessary, replaced on a Unit Price basis (Base Bid quantity with additional ADD/DEDUCT pricing). 5. The existing roof drains will be inspected and, if necessary, replaced on a Unit Price basis (Base Bid quantity with additional ADD/DEDUCT pricing).