Notch Road Scope of Work: Work will include culverts, culvert headwall, ditching stone line ditches, hydroseed/seed & mulch, ledge hammering & removal, Rip Rap, minimal brush & tree cutting and restoration of road surface to include final grading and compacting. Work will include all tools, equipment, labor and materials necessary to complete the work in a safe and professional manner. Estimated Quantities Culverts – 36” – 40 LF Culverts – 18” – 60 LF Culvert Headwall – 12 Concrete Waste Block Ditching - 2,000 LF Stone Line – 1,500 LF – 334 C.Y. – 8” Minus Hydroseed/Seed Mulch – 3,000 S.F. Ledge Removal – Hydraulic Hammer – 12 Hrs Rip Rap – 50 C.Y. – 12-18” Road Surface – 4,000 L.F. – 1,108 C.Y. – 1 ¼” Granite Gravel Zdon Road Scope of Work: Work to include installation of culverts, ditching, stone line ditches, hydroseed/seed & mulch and restoration of road surface to include final grading and compacting. Work will include all tools, equipment, labor and materials necessary to complete the work in a safe and professional manner. Estimated Quantities Culverts – 30” – 60 LF Culverts – 48” – 60 LF Ditching – 1,000 LF Stone Line – 250 LF – 56 C.Y. 8” Minus Hydroseed/Seed Mulch – 4,500 S.F. Road Surface – 1,000 LF – 2.77 C.Y. – 1 1/4” Granite Gravel