Specifications include, but are not limited to: Major Project scope items include: • Roundabout design • ADA Improvements • Sidewalk/Pedestrian Improvements • Utility relocations, if required. The engineering responsibilities may include but are not limited to the following: The preparation of Conceptual plans, Preliminary plans, Contract plans. Design services may include, right of way plans, surveying, geotechnical investigations, retaining wall design, storm water drainage design, public involvement, traffic control plan design, contract documents, assisting with the bidding process, construction support as needed, utility coordination and traffic controls including the preparation of PS&E and final documents. • Preparation and submittal all necessary environmental clearances as necessary • Preparation of all permitting required • Conduct topographic and ROW surveys at the project intersections and prepare electronic deliverables • Prepare concept engineering plans (30%) that include horizontal alignment, vertical alignment, basic intersection geometrics, traffic engineer to look at signal geometrics and design, conceptual Page 4 of 9 improved drainage design, conceptual traffic control plan, and cost estimate