The proposed project consists of the relocation of existing water infrastructure between 2nd Street and 4th Street as well as fire hydrant replacement between1st Street and 9th Street along Main Street in conjunction with the re-construction of Main Street within the City of Ketchum. Work includes: • Demolition: includes sawcut and asphalt/ concrete removal necessary for the installation of Water Infrastructure and fire hydrant replacement. • Water Infrastructure: includes but is not limited to water main line, associated appurtenances/fittings, and existing water service extensions. All trenching shall be backfilled for temporary vehicular access per Water Construction Drawings. • Fire Hydrant Replacement: includes but is not limited to replacement of fire hydrant fixtures and/or assemblies along Main Street between 1st Street and 9th Street. • Traffic Control: includes preparation and implementation of traffic control plan and road closure schedule consistent with MUTCD standards.