Specifications include, but are not limited to: In general, the Contractor shall supply all labor, materials, equipment, temporary protection, tools, and appliances necessary for the proper completion of the work, as required in the Specifications, in accordance with good construction practice, and as required by the materials manufacturer. The work includes, but is not limited to, the following items: A. Supply all temporary shoring, lighting, barricades, signage, and protection necessary to protect the building areas, building systems, and building patrons and public. Maintain such protection for the complete duration of the project. B. Supply all disposal facilities, transportation and labor necessary to dispose of all demolished materials, dirt, and debris off-site in a legal dumping area. The Contractor shall obtain all permits necessary to transport and dispose of all materials, rubbish, and debris. C. Provide temporary fencing around set-up and storage locations. Set-up and lay down areas should be sufficient for all sub-trades to have adequate area to store materials and equipment. Set-up and lay down areas must be within areas designated by the Owner. D. Provide shoring of the below grade tunnels adjacent to work areas and as indicated in the Contract Documents. E. Complete all associated work in accordance with the project specifications and Contract Drawings. Coordinate the work with the Owner. F. The Contractor shall provide all lifts, cranes, and equipment necessary to access and perform the work. G. Remove, protect and/or store all materials and assemblies to be reinstalled. H. Remove and dispose of existing roofing materials, including but not limited, to rolled asphalt roof membrane, flat seam metal roof, and wood plank deck at Roof Area A1.