The work includes but is not limited to the following: A. The project is funded by the Federal Highway Administration (FHWA)/CMAQ Funds and Santa Fe County matching funds. Products used on New Mexico Department of Transportation (“NMDOT”) Projects must be approved by the NMDOT’s product evaluation program and listed on the NMDOT’s approved products list (“APL”). The Bidder’s Bid Item Unit Price for the Project shall be deemed to rely on the use of the products listed on the APL. The Contractor shall comply with all APL procedures required Contractor to provide materials that comply with the Buy America requirements in 23 CFR § 635.410. B. The work will include 10-feet wide concrete sidewalks 6-inch depth, earthwork, erosion control, rock gravity walls, one prefabricated steel truss bridge including drilled shaft foundations, seeding and trail signs. C. Segment 2 – construct a 1.2-mile-long concrete multi-use trail connecting the existing Rancho Viejo Fire Station Trailhead to the Turquoise Trail Sport Park off of NM 14. D. Segment 3 – construct 1.6-mile-long concrete multi-use from connection with existing trail NW of Rancho Viejo Fire Station to Richards Avenue and extension to Avendia Del Sur and Velocity Road roundabouts.