Specifications include, but are not limited to: The 2020 Moultonborough Bay and Winter Harbor Watershed Management Plan identified 107 sites contributing excess nutrient loading to Lake Winnipesaukee. This project will implement 3 of the top 10 sites identified in the plan, resulting in a reduction of sediment and nutrient loading to Moultonborough Bay, Lake Winnipesaukee by 28,000 lbs. of total suspended solids (TSS), and 13 lbs. total phosphorus (TP) annually. This reduction will achieve 32% of the target goal needed to meet the water quality goal set for Moultonborough Bay. The overall project consists of implementation of best management practices at three sites in Tuftonboro, including site preparation, placement of materials, re-vegetation of the site and site finishing. The contractor must provide costs for all items within the project, as described below and as shown on the Plan or in specifications.