Specifications include, but are not limited to: 1. Furnish and install ACM Metal Panels (EWS-2) and Aluminum Panels (EWS-3), insulation, and thermallybroken support systems, including at exterior ceilings/overhangs. Scope of work specifically includes column covers(interior and exterior), metal panels on Main Canopy, and painted metal coping at Main Canopy(SIM 2F/A521). 2. Metal panel system includes all associated components for a complete installation including all fasteners, joint clips, support framing, starter strips, caps, ACM inserts at panel joints, flashings, weep holes, trim, top/bottom/end closure pieces, weeps, silicone transition sheets, termination bars, and baffles, etc. 3. Locations where silicone transition sheets tie directly to curtainwall or window mullions are furnished and installed by others. 4. Provide all joint sealants at panel joints and perimeter of metal panels to dissimilar material. Joint sealants to be provided in prefinished color selected by the architect from manufacturer’s full range of colors. This contractor will provide documentation of all manufacturer’s warranties for sealant products. 5. Metal Panel corner pieces to be bent at custom lengths as required to meet overall aesthetic design intent. Flashing cover pieces are not the design intent. 6. This subcontractor to provide all reveals in metal panels. Exterior Expansion Joints within the metal panel system are included in this scope of work. Including, but not limited to, insulation, firesafing, caulking, flashing, sealant, etc. as required for complete installation of expansion joint assembly. 7. Metal panels to be provided in color and finish as selected by the architect. Scope of work includes custom color and associated 20-year finish warranty. 8. Substrate system by others includes gypsum sheathing with fluid applied waterproofing on exterior sheathing as indicated on the contract documents. This subcontractor is responsible for all installation components required from substrate to exterior face of building., to include sealing any penetrations made in waterproofing. 9. This subcontractor is responsible to furnish and install all hat channel, sill channel, backing, etc. as required for installation of metal panels. 10. Provide layout and engineering for all work of this subcontract. Provide calculations certifying that panels and substrate will withstand the wind loads indicated in accordance with contract documents.