Specifications include, but are not limited to: 1. Development of Service Line Material (SLM) Inventory: a. On each side of the water meter (i.e., City-side and Customer-side) and no closer than3 feet from the meter box, the contractor shall conduct field service line verification to identify unknown service line materials via: excavation, hand hole, potholing, or other approved means to accomplish this task. If water service lines are damaged, the contractor shall be responsible for repair of damage to service lines. b. Document and photograph service line material types uncovered by potholing. c. Potholes are to be backfilled and ground surface restored to match existing conditions. Where pavement cutting is required, pavement restoration shall match existing pavement type. d. Contractor is to provide deliverables including GIS data, completed spreadsheet and photo documents tied to service line address.