Supply and install all required equipment, materials, and labor for “100% Turnkey” installation and complete commissioning of dual port EV charging station including, but not limited to: Provide preliminary design for installation of chargers subject to approval by City of Biddeford; Provide final design for installation of chargers, including designation of parking spaces, power source, power requirements, metering location, trenching plan, subject to approval by City of Biddeford; Supply one (1) ChargePoint Model CT 4021 dual port Level 2 electric vehicle charging station, including quote for both 1‐year and 5‐year networking plan; Supply and install concrete mounting base for charger; Supply and install two (2) protective bollards for charger; Obtain all necessary electrical permits, including applicable taxes; Provide trenching and backfill (or similar) for electrical conduit, as needed for electrical service; Extend and install electric service to charger location; Install and commission EV charger. Contract will be negotiated upon acceptance of proposal by City and award of grant by U.S. DOT. Grant will be awarded late Spring, 2024. To be provided by the City: Proper signage Parking stall striping (as needed)