Specifications include, but are not limited to: DIVISION I – Water Distribution System: The scope of work in Division I includes the furnishment and installation of approximately 4,800 LF of 30–inch water main, and 1,500 LF of 16–inch water main parallel to U.S. Highway 80 and Bill Futch Road. The work shall include horizontal directional drills (HDD), jack and bores, butterfly valves, air release valves, fire hydrants, and all other appurtenances necessary to complete the project. DIVISION II – 1,800 gpm Well: The scope of work in Division II includes construction of a new 1,800 gallon per minute (GPM) potable water supply well in Bulloch County near Bill Futch Road. The work in Division II includes the new 1,800 GPM deep Floridan Aquifer water well, wellhead piping, well building, hydropneumatic tank, electrical components, SCADA, and all necessary material, labor, and appurtenances associated with the new water supply well as shown on the plans and in the specifications. DIVISION III – Old Cuyler Road Booster Station: The scope of work in Division III includes the furnishment and installation of a five (5)–pump booster pump station along Old Cuyler Road. The work shall include all site work, building, piping, all electrical, SCADA, concrete, and other accessories as shown on the plans necessary to complete the project.