Specifications include, but are not limited to: The Contractor shall provide dark fiber facilities within the city of Concord. The Contractor shall include all facilities and equipment necessary to install terminated fiber strands of dark fiber connecting each location noted below. 129 Pleasant Street to 25 Capitol Street 1.84/1.14 km/mi. 25 Capitol Street to 7 Hazen Drive 2.90/1.8 km/mi. Cable Path: The State does not intend to define fiber pathways. Contractor shall provide graphic map (AutoCAD and PDF formats), identifying each proposed pathway, and distance with the Bid submission for review and acceptance by the State. It is the responsibility of the Contractor to obtain required permits and access to utility poles or conduit. The Contractor shall be responsible for all cable pathways, obtaining required rights-of-way, utility make ready, conduit, conduit installation, cable provisioning, all related equipment and installation logistics.