This project consists of, but is not limited to, the removal and installation of sanitary manholes of varying depths, the abandonment of sanitary sewer main, the removal of sanitary sewer main, and the installation of 8” PVC sanitary sewer pipe. The installation of new sanitary sewer main includes, but is not limited to: the installation of sanitary sewer pipe, the reconnection of existing sanitary sewer services, removal of asphalt roadway, and the placement of aggregate base or cold mix asphalt in areas where asphalt has been removed to allow temporary vehicular access, the, paving of all removed asphalt roadway, and the operation of a temporary bypass pump to allow connection of the new sanitary system to the existing without disruption of sewer service. All work shall be completed as shown on the construction plans and as described in the specifications.