Specifications include, but are not limited to: 1. All tucks must be capable of carrying a minimum of 11 CY of material per load. 2. Contractormustensurethatalltruck’susedmustbeproperlyregisteredandinspected.The City reserves the right to verify this information. 3. Trucks used for Material Hauling shall have clean, end/side‐dump boxes with no material staying in the box when unloaded. If truck does have condition in which material remains, the City personnel will remove the truck from operation and billable time will stop upon notification to driver. Truck will not be allowed to return until material condition is corrected and visually inspected by city personnel. 4. All drivers must be properly licensed operators. Contractor is responsible for updating operator information as necessary. The City reserves the right to verify this information. 5. Contractor must provide contact information for designated representative for truck scheduling. The inability to make contact with Contractor within a reasonable amount of time is cause for the City to use other Contractors. 6. The City shall have no obligation to engage the services of the Contractor for a specified number of times. 7. Contractor shall be knowledgeable and comply with all federal, state, and local laws, rules, regulations and ordinances that may be applicable to the operation of the equipment provided by Contractor for material removal trucing services. 8. This contract is binding on the City and the contractor, their successors and assigns. Neither the City nor the contractor will assign or transfer its interest in this contract without the written consent of the other. 9. Termination without cause. Either party may terminate the contract by giving ten(10)days written notice to the other party. 10. The contractor is responsible for all applicable state and federal social security benefits and unemployment taxes and agrees to indemnify and protect the city against such liability. 11. The contractor will comply with all federal, state, and local laws and regulations. All documents developed as a result of this contract will be freely available to the public. None may be copyrighted by the contractor. During the performance of the service, the contractor will be responsible for any loss of or damage to the documents which are in its possession and must Restore the loss or damage at its expense. Any use of the information and results of this contract by the contractor must reference the project sponsorship by the City.