Specifications include, but are not limited to: Separate sealed BIDS to furnish and install the following materials and appurtenances for the City of Pierre’s STREET PAVING PROJECT 2024 which includes but is not limited to: BID SCHEDULE “A”: Construction of approximately 7,400 Tons of (1/2”) Hot Mix Asphalt with 20% RAP (RAP Provided by OWNER from 2024 millings/hauled by CONTRACTOR), 650 Tons of (3/8”) Hot Mix Asphalt, 27 Tons of Tack Oil, 380 Tons of 58-34 Binder with Evotherm, 38,500 Square Yards of Cold Asphalt Milling, 35 EA Adjust Manholes w/ Owner Furnished Rings, and a Schedule “A” Alternate that includes: 60 EA Adjust Valves w/Owner Furnished Materials. BID SCHEDULE “B”: City Patch Mix and Paver-Laid Patch Mix. All to be completed on City streets, roads, and parking lots.