Specifications include, but are not limited to: Fairmont State Airfield • 2025 Rehabilitate Parallel Taxiway and Connecting Taxiways to Runway 17/35 (Estimated Construction Cost: $1,702,000) • 2026 Remove and Replace Runway 17/35 Lighting System (MIRL) (Estimated Construction Cost: $478,000) • 2027 Apron Rehabilitation (Estimated Construction Cost: $1,500,000) • 2028 Install PAPI & REILs (Estimated Construction Cost: $425,000) Harvard State Airfield • 2025 Rehabilitate Taxiways and Drainage Improvements (Estimated Construction Cost: $1,569,000) • 2026 Rehabilitate Hangar (Estimated Construction Cost: $175,000) • 2027 Apron Rehabilitation (Estimated Construction Cost: $950,000) • 2028 Install PAPI & REILs (Estimated Construction Cost: $425,000) Scribner State Airfield • 2026 Rehabilitate Parallel Taxiway and Connecting Taxiway to Runway 17/35 (Estimated Construction Cost: $5,677,000) • 2026 Rehabilitate Hangar (Estimated Construction Cost: $175,000) • 2027 Apron Rehabilitation (Estimated Construction Cost: $400,000) • 2028 Install PAPI & REILs (Estimated Construction Cost: $425,000) The required services at each airfield may include, but are not limited to; engineering services for preliminary design, bidding and construction phases, and incidental special services including geotechnical and surveying.