Specifications include, but are not limited to: 1. Equipment and Labor: a. Provide all labor and equipment to complete the following work on the following: Removal to be done on asphalt with grinding method and debris cleaned prior to application. Edge Markings from hold 15-33 hold position leading onto taxiways G, H, M, B, C, J. Edge Markings from 19-1 hold position south on B. Taxiway C/G to the Valley West Apron. Taxiway G from the Valley West Apron to Valley. Taxiway J from 15-33 hold to Valley. Total of 5,830 Lineal feet of solid edge line markings. 2. Marking Requirements: a. Required use of airport provided materials b. Black waterborne paint c. Yellow waterborne paint d. Type 1 glass beads 3. Description: a. Taxiway edge markings continuous b. Two reflective yellow lines to be incased with black paint c. Yellow paint must be applied by machine with a pressurized bead application d. Dimensions of both colors 6” e. Total width 30”