Specifications include, but are not limited to: 1.00 GENERAL CONDITIONS 1.01 MOBILIZATION & PROJECT INCIDENTALS 1 LS $ $ 1.02 STORMWATER POLLUTION PREVENTION PLAN 1 LS $ $ 1.03 STORMWATER POLLUTION PREVENTION PLAN IMPLEMENTATION 1 LS $ $ 1.04 TRENCH SAFETY PLAN 1 LS $ $ $ 2.00 SITE IMPROVEMENTS 2.01 CLEARING AND GRUBBING 8 AC $ $ 2.02 UNCLASSIFIED EXCAVATION (6,200 CY CUT, 13,500 CY FILL) NO OFF-SITE HAULING OF EXCAVATED MATERIAL REQUIRED (ALL MATERIAL SPREAD ON SITE) 6,200 CY $ $ 2.03 NATIVE BACKFILL (TRUCKED FROM SECTOR 1 SOIL STOCKPILE) (ADDITIONAL NATIVE BACKFILL NEEDED FOR SITE CONSTRUCTION) 2,200 CY $ $ 2.04 6" LIME STABILIZED SUBGRADE @ 35 LBS/SY (EXCLUDING BUILDING FOUNDATION) 20,550 SY $ $ 2.05 COMMERCIAL LIME SLURRY (EXCLUDING BUILDING FOUNDATION) 360 TON $ $ 2.06 6" CRUSHED CONCRETE BASE, TYPE D, GRADE 1-2 13,290 SY $ $ 2.07 8" CRUSHED CONCRETE BASE, TYPE D, GRADE 1-2 3,745 SY $ $ 2.08 6" REINFORCED CONCRETE PAVEMENT 1,310 SY $ $ 2.09 2" HOT MIX ASPHALTIC CONCRETE PAVING, TYPE C SURFACE COURSE (INCLUDING PRIME COAT) 11,980 SY $ $ 2.10 HYDROMULCH BERMUDA (ALL DISTURBED AREAS OUTSIDE PAVING) 4 AC $ $ 2.11 CUSTOMER CONVENIENCE CENTER RETAINING WALL (RE. STRC) 325 LF $ $ 2.12 6" LIME STABILIZED SUBGRADE @ 35 LBS/SY (BUILDING FOUNDATION) (5' DEPTH ACHIEVED IN 6" LIFTS) 6,400 SY $ $ 2.13 COMMERCIAL LIME SLURRY (BUILDING FOUNDATION) 112 TON $ $ 2.14 SELECT FILL FOR BUILDING FOUNDATION (RE. STRC) COMPLETE AND IN PLACE 860 CY $ $ 2.15 MAINTENANCE BUILDING - NEW CONSTRUCTION (INCLUDING ARCH, STRC, AND MEP UNLESS QUANTIFIED ELSEWHERE) 1 LS $ $ 2.16 SITE ELECTRICAL (INCLUDING CONNECTION TO POWER SUPPLY, MAINTENANCE BUILDING / MODULAR OFFICE, AND ALL SITE LIGHTING). ELECTRICAL WORK WITHIN THE MAINTENACE BUILDING SHALL BE IINCLUDED WITHIN BID ITEM 2.11. 1 LS $