This project consists of the construction of a New Aquatics Complex (REBID) for the City of Gwinner. This project includes several schedules, additive and deductive alternates as further described below: Schedule I: This schedule includes the construction of 2 CMU buildings with wood truss roofs and metal surface finishes. The new bathhouse is 1700 SF and the filter building is 420 Sf including all electrical and mechanical features for both as outlined in the plans, the concrete decks with drainage system including connection to the 6” sewer service, the concrete for the splash deck area, the under concrete piping from the filter building to the splash deck end caps, the drains and piping from the splash deck to 5’ outside the perimeter fence, perimeter chain link fences, the site demolition and new site grading and miscellaneous items for complete installation. Schedule IIA: This schedule includes the construction a 5,200 SF concrete swimming pool with stainless steel gutter and installation of owner provided cartridge filters with pump, installation of owner provided electric pool heaters, installation of Owner provided chemical feed system, deck equipment and miscellaneous items for complete installation of the swimming pool recirculation and chemical feed systems. Schedule IIB: This schedule includes the construction a 5,200 SF contractor designed vinyl/vermiculite/galvanized swimming pool with wall inlets, skimmers, fill line piping and pump manifold, the engineered and wet stamped drawings and certifications and installation of owner provided cartridge filters with pump, installation of owner provided electric pool heaters, installation of Owner provided chemical feed system, deck equipment and miscellaneous items for complete installation of the swimming pool recirculation and chemical feed systems. Schedule III: Installation of contractor provided features on the 900 SF splash deck, provide and install a manifold system with feature controller, with installation of an Owner provided recirculation and a cartridge filter with pump, Owner provided electric pool heater, installation of an Owner provided chemical feed system, provide and install a 2,500 gallon storage tank with connection fittings, a 48” strainer MH with internal piping and miscellaneous items for complete installation Schedule IV: This schedule includes the extension of 425 LF 8” PVC sewer main, 1 manhole1, 1 drop structure, 185 LF 6” sewer service, 345 LF 2” HDPE water main, 2 2” curb stops, surface restoration and miscellaneous items for complete installation. Additive Alternate No. AI: Installation of an asphalt, concrete curb gutter and sidewalk drop off loop. There is 180 LF concrete curb & gutter removal, 660 SY subgrade preparation, 110 CY aggregate base, 570 LF concrete curb & gutter / valley gutter, 135 SY 5” concrete sidewalk, 1420 TON commercial grade hot mix asphalt and miscellaneous items for complete installation.