Specifications include, but are not limited to: The City is seeking Bids for the removal of the temporary bypass pump forcemain piping and all associated fittings. The work shall include but is not limited to removal of the bypass piping in its entirety, full restoration of all driveway crossings and trenches in accordance with Exhibit H - Drawing D1 – Temp Bypass FM Pavement Restoration Details, restoration of fencing at the North Wastewater Treatment Plant and landscape restoration. The City is also requesting bid costs for an add alternate to remove the 2,500 gallon, 13’ x 7’ x 6.5’ precast concrete detention vault located at the North WWTP. The City is seeking qualified construction teams that can perform all aspects of the removal of the 12” HDPE pipe, including excavation, traffic control, site maintenance, landscaping, and all other tasks necessary for a complete project in accordance with the contract documents.