Specifications include, but are not limited to: Hang, tape and 3 coat finish 1/2" drywall. Apply a 3/8" bead of low VOC drywall adhesive to each framing member and install using drywall screws min. 1 5/8 long, 8" on center. Run Boards with long dimension perpendicular to frame members. Sand ready for paint; DRYWALL WLL NOT NEED TO BE PAINTED; Install a 4" cast iron sewer line from structure and connect to the public sanitary sewer system. Install clean-outs as required by local codes. Regrade yard in work area, sow grass see and spread straw to reestablish lawn. Contractor to supply and pay for all permits and road repairs. Contractor to pay fir sewer tap fees. Install a 40 gallon, glass lined high recovery, insulated to R-7, gas water heater with a 10 year warranty. Include pressure and temperature relief valve, discharge tube to within 6" of floor or to outside of structure, vent, thimble, and gas piping from shut-off valve to fixture. Dispose of old water heater in code legal dump. Install to Code; Install schedule 40 PVC pipe and fittings, solvent welded after a dyed cleaning step. Install pipe with hangers 3' on center without critical damage to structural members. Install to CODE