Specifications include, but are not limited to: 6. Services to be performed: A. Clear and remove all overgrown vegetation that is within five (5) feet of fence line. B. Furnish and install new “I beam” barb arms to the current decorative iron fence. Arms will be a maximum of 10' apart. At terminal points, wire will be fastened to the fence. C. Install two strands of 4-point barbed wire and razor wire, which will be stretched over the existing fence. Barbed wire and razor wire will also be stretched over large roll gates in the same fashion. D. Gate posts shall be extended to clear barb wire and supporting posts. E. Prepare decorative fence surface, prime using a rust proof primer and repaint fencing with similar color. F. Maintain a safe working environment to prevent injuries to CHP personnel or damage to CHP property. G. At no expense to the State of California, will repair any damage caused by the Contractor or any of his/her workers. H. Must field verify any and all measurements encompassed in this project and is solely responsible for their accuracy. I. Ensure that the back-parking lot is secured at the end of each construction day to prevent intruders from entering into the facility grounds. J. Will keep the work site clean and haul away any work site debris. All material removed must be recycled where possible. K. After project begins, project must be completed within ninety (90) days.