Specifications include, but are not limited to: Building is to be 50’ by 140’ clear span throughout Building is to be a pre-engineered post/truss frame building open on one side with horizontal wall girts on three sides with metal siding application. Install metal wall panels from eave down 12’-0”. Gable ends of roof/Truss system to be sided with metal wall panels. All post/columns to be fully pressure treated preservative wood members. Roof covering to be 26-gauge Delta Rib steel panels or equal and all accessories for roofing to match. Wall panels to be 29-gauge Delta Rib metal panels or equal. MDT will select color package. Interior space MINIMUM opening height from grade level to bottom of truss’s is to be 22’-0” throughout entire structure. Truss pitch to be 4/12 or 5/12. Provide all wall girts and truss purlins needed for metal wall/roof panel installation as required. Building code design loads for wind, Snow and Seismic need to be taken in as consideration for building site area. Structurally brace all trusses as required.