Specifications include, but are not limited to: The selected firm shall perform preliminary engineering and plan development services necessary to produce construction contract documents for the listed project in accordance with INDOTs designated letting schedule. The selected firm will also be responsible for: Environmental Document (CE) and Section 4(f)), Historical/Architectural Investigations, Phase I ESA, Topographic Survey, Geotechnical Engineering, Roadway and MOT Design and Plan Development, Lighting Design, Right-of-Way Plan Development (Engineering and Staking), Right-of-Way Title Research, Utility Coordination, Subsurface Utility Engineering (SUE), Railroad Coordination, Storm Sewer and Detention Design, Pavement Design and Construction Phase Services.