Specifications include, but are not limited to: The selected firm will perform the design and plan development work necessary to produce the construction contract documents. The selected firm will be required to provide an Abbreviated Engineering Assessment Report, Environmental Documentation, all Permits, Topographic Survey Services (see below), Road Design, Pavement Design, Geotechnical Investigation, Utility Coordination, Hydraulic Analysis and Design, Right of Way Plan Development (including Abstracting, R/W Engineering and R/W Staking) Real Estate Acquisition Services, and Construction Phase Services. Additional services may also be required, such as, Wetland Mitigation, Archaeological Investigations and Historical/Architectural Investigations. The INDOT Project Manager and the Consultant will schedule the Scoping Meeting within two (2) weeks of the Notice of Selection. The selected consultant's fee proposal shall be due 45 calendar days after the selection date for this RFP item. Seymour Survey In-House Department will be responsible for the topographic survey services for the following des. nos. 2301033, 2301034, 2301031, 2301183, 2300999, 2301022 and 2301003.