Specifications include, but are not limited to: The CONSULTANT's personnel shall work under the INDOT Area Engineers or their designated representative. INDOT anticipates the need for 1 Project Engineer, 1 full time Project Inspector, and 1 part time Project Inspector. The Project Engineer at 4,500 hours (3,200 Reg, 1,300 OVT). 1 Full time Project inspector at 4,500 hours each (3,200 Reg, 1,300 OVT) and 1 Part time Project Inspector at 2,000 hrs (1,500 hrs REG, 500 hrs OVT). The work type and the contractor's schedule will ultimately determine the length of time each Project Engineer(s)/Supervisor(s) and Project Inspector(s) will work on this contract. INDOT may require personnel to work in any season, work for up to twelve (12) hours per day, or work at night. The CONSULTANT shall furnish all construction field testing equipment necessary to sample and test materials in accordance with INDOT procedures. The CONSULTANT shall furnish all necessary safety equipment needed for inspection and sampling and testing of materials. The consultant shall provide personnel local to the project such that neither lodging nor subsistence expenses will be incurred. The Letter of Interest (LOI) must specify the names of the Project Engineer(s)/Supervisor(s) and Project Inspector(s) who will be supplying the services on the construction contracts. Also, a map showing the residential locations of these personnel must be provided in the LOI. Personnel identified in the LOI who are not full-time employees at the time of LOI submittal shall be identified with explanation of employment status. The LOI must identify the specific subject area certifications that personnel have obtained through the INDOT Certified Technician Program (CTP) unless the personnel are exempt. Information on this program can be found at: http://www.in.gov/indot/2403.htm [in.gov]. INDOT will not reimburse for any time or expense incurred in obtaining certifications at any time. INDOT does not allow consultants that performed design for the contract to be the prime consultant for inspection and does not allow these consultants to provide the Project Engineer/Supervisor services. See the INDOT Conflict of Interest Policy for more information. The selected consultant's fee proposal shall be due 15 calendar days after the selection date for this RFP item. A field overhead rate will be used for this contract. Consultants without audited field overhead rates may propose a field rate at the time of contract negotiation.