Specifications include, but are not limited to: The scope of services for this project includes but is not limited to pre-construction and construction services to support the City and its Design Team(s) during final project permitting, design, and construction of Engine 2 Fire Station. The CMAR will be required to hold contracts with contractors and subcontractors, coordinate the work of this project and any additional work, with City Fire Department, City Administration, and with other City of Auburn business partners. The Design Team for Engine 2 FireStation includes Woodard & Curran and its consultant team of Simons Architects, Context Architecture, Thornton Tomasetti, Allied Engineering, and S.W. Cole Engineering. City intends to engage the CMAR to provide pre-construction services for the project. Without limitingthe general nature thereof, the Scope of Services will include the following:1.Attendance and participation in meetings throughout the pre-construction phase of the projects.2.Participation in team-based value management, to include:•Cost estimating throughout pre-construction•Value engineering and alternatives analysis•Support and participation in life-cycle cost analysis of building systems3.Construction schedules, logistics and constructability reviews.4.Permitting support if necessary.5.Procurement• Identification of long lead items and materials• Pre-purchasing of long lead items if necessary• Subcontractor pre-qualification and availability• Competitive bidding and award of subcontracts in support of schedul