Under this proposal, the selected contractor shall provide and install access control to exterior school doors identified in the mandatory walk-through for bidders. B. Some schools identified will need a security window installed at a specified location for that school. C. Access control will be controlled through the DMP panel. D. The security equipment installed shall be as indicated in the following specifications. E. All specifications deviations must be listed “line for line” and must be clearly stated what “end effect” will be unattainable if any. All specifications must be represented fully by contractor and any and all “shortfall” must be clearly stated and any or all-adverse effects from those deviations or” shortfalls” must be stated. Any deviation(s) between what is specified and what is being proposed shall be so indicated by the contractor on an attached page, indicating the item in the proposal for which there is a product deviation or variance and a detailed explanation of the deviation. All such deviations shall become a part of the contractor’s proposal.