Specifications include, but are not limited to: The selected contractor will be expected to enter into an agreement with the District to perform the work as outlined in the RFP. The scope of work includes, but is not limited to, the following: 1. Replacement of door assemblies (frame and slab) at specified locations, replacing like for like with no specific preference to brand. Specification match to include, but not limited to: a) Swing type (except where noted) b) Fire rating c) Insulation rating d) Hardware configuration e) Glass configuration f) Sweeps, astragals, weather stripping, etc. g) Location/Configuration (Where applicable) i) Alarm Sensor ii) Badge Reader iii) Aiphone iv) Keypad 2) Contractor to verify actual field dimensions 3) Contractor to include the following with their proposal: a) Door paint to match existing b) New hardware c) Disposal of all debris and scrap d) Temporary Protections and Staging i) Finishes protection ii) Egress and security continuity