Provide all materials, equipment/tools, and labor to install a new mound sanitary system for the new Glen Hills bathroom/shower facility. The soil test and design for the system have already been completed and state approval has been received. The estimate must include any plumbing and electrical between the system and proposed building site. The installation of the system should avoid peak campground usage on or near holidays and weekends. Erosion control measures shall be taken throughout construction of the sanitary system, and it shall be seeded upon completion. Some tree removal may be required to get materials into the site. The County will have the sanitary permit, but the plumber will be responsible for setting up the inspection of the system