Specifications include, but are not limited to: METAL GUARD RAIL ? WROUGHT Design, fabricate, prime, topcoat and install a one-piece steel railing of 2? flat top and bottom rails and ¼? balustrades 6? on center. INSTALL METAL HANDRAILSSIDEWALK, PORCH AND REAR ENTRACE; DOOR--CRAWL SPACE ACCESS Install a 3/4" CDX plywood access door in a 2"x4" preservative treated frame. provide galvanized iron hinges and hasp.; GUT STRUCTURE INTERIOR-BATHROOM Remove all the wall tile, tub, flooring, and disconnect existing plumbing, equipment, debris and dispose of in legal landfill.; SUBFLOOR-3/4? Install ¾? tongue and grove CDX plywood decking nailed 8? on center using screw shank or cement coated nails.; BASEBOARD?COLONIAL3 ¼? Install finger jointed WM-623fj 9/16? x 3-1/4? colonial base with finish nails of sufficient length to penetrate framing 1?. Mitre all lap joints and break all lap joints over framing.; Install pine shoe molding nailed 2? on center to create the tightest possible seal between the baseboard and floor using finish nails or tee headed brads.; ACCESSORY SET ? 4 PIECE CHROME Install a chrome plated steel bathroom accessory set consisting of two 24? towel bars, one towel ring, and a toilet paper holder.