Specifications include, but are not limited to: • Removal and replacement of asphalt, asphalt curb and sub-grade at 834 Tyner Way, in Incline Village, Washoe County, Nevada. • Install BMPs to protect storm drains. • Saw cut, (control/contain/vacuum saw run off) remove and properly dispose of approximately 6,100 SF of asphalt. • Remove and properly dispose of 240 LF of AC curb. • Remove and properly dispose of compromised sub-grade. • Re-compact disturbed sub-grade to 95% MDD. • Replace removed sub-grade with 8 inches (3 inch maximum lift) of new Type II base, and compact to 95% MDD. • Replace asphalt with 2, 3-inch lifts of hot mix Type 3, PG64-28, 3% voids, 50 blows per side mix asphalt with 1.5% lime and no more than 15% recycled asphalt pavement, compacted to a minimum of 93% Rice Relative compaction. • Replace 240 LF of AC curb with returns at the driveways and the upper end. • Backfill and compact Type II base behind new curb, leave 3 inches below top of curb.