Specifications include, but are not limited to: This project consists of several improvements in the Walesboro Industrial area. The selected firm will be required to complete the design work on all improvements. The improvements to be included are as follows: 1. Improvements Related to Toyota Material Handling Expansion Widening of CR 225 W to 2 - 12’ lanes Installation of a 10-12’ wide asphalt side path along CR 225 W from Deaver Road to CR 300 S, and along the CR 300 S site frontage Reconfiguration of the intersection of CR 225 W and Deaver Road to align with the exiting Toyota entrance; 2. Deaver Road Sanitary Sewer Design of a new 12-inch gravity sewer extending from a manhole on the south side of County Road 150 W and Deaver Road approximately 4,000 feet west on Deaver Road; 3. Improvements to the Intersection of Deaver Road and CR 175 W Geometric improvements to allow WB-67 truck turning movements; 4. Realignment of CR 175 W Realignment of CR 175 W to intersect Deaver Road at the intersection of CR 150 W and Deaver Road Removal of a section of existing 175W between new alignment and Deaver Road; 5. Improvements to the Intersection of CR 450 S and CR 175 W Traffic Signal Warrant Analysis Traffic signal design if warranted Geometric improvements to intersection; 6. International Drive Geometric Improvements Geometric improvements to allow WB-67 truck passing movements, as outlined in American Structurepoint Safety Study.