Specifications include, but are not limited to: 1. Remove and dispose of all Category I, II, RACM materials and all listed materials in pre demolition report. 2. Any windows or doors removed during abatement must be boarded. 3. Raze and remove all structures and debris from parcel. 4. Remove private driveway and walkway. 5. Remove any sidewalks and curbing marked by the City. 6. Remove concrete driveway approach and replace with concrete curb and gutter. 7. Remove all wood fencing. 8. Remove and stump all trees and bushes, including tree in the parkway. 9. Remove and cap sanitary sewer and water. Bidder should be prepared to camera the sanitary sewer lateral to determine exact location. 10. Backfill, grade and seed site including driveway approach in accordance with the general specifications and Erosion Control Plan. 11. Obtain necessary Federal, State and Local permits. 12. Site to be kept safe and road cleaned at the end of each work day