Specifications include, but are not limited to: The project includes, but is not limited to, the removal of approximately 650 linear feet of taxiway pavement and the construction of approximately 1,800 linear feet of new concrete taxiway pavement. The removal includes approximately 4,650 SY of concrete pavement, 10,800 SY of asphalt pavement, 1,600 LF of drainage pipe, and the associated drainage structures, existing lighting infrastructure and pavement marking. The construction includes approximately 3,750 CY of embankment, 41,100 CY of excavation, 29,700 SY of new concrete taxiway pavement, 20,250 SY of asphalt shoulder, 850 SY of new asphalt roads, 1,600 LF of reinforced concrete pipe, 3,200 LF of concrete ditch paving, 45,000 SF of pavement marking, and the associated base course(s), underdrains, drainage structures, taxiway edge lighting, centerline lighting, guidance signs, airfield electrical lighting infrastructure, and FAA communications infrastructure as shown on the plans and indicated in the specifications.