Specifications include, but are not limited to: The interior renovation will include new finishes including new ACT ceilings and grids, wall paint, and new VCT and other flooring throughout the entire building. Interior signage will be updated and replaced. The reroof includes complete removal of the existing roof down to the roof deck. A new two-ply SBS Modified Asphalt roof system will be cold adhered over new rigid board insulation and cover board. All prefinished metal trims, flashings, accessories, and terminations are included. Boilers, evaporative cooler, and pumps will be replaced with new ones for this project. All above ceiling horizontal heat pumps will be replaced in this project. All new diffusers and grilles will be provided throughout. All air handling troffers will be removed and replaced with new dedicated supply diffusers. All new controls will be provided in accordance with KCTCS standards. Existing circuits will be reconnected to all new HVAC equipment. All existing lighting in the building will be replaced with new LED based light fixtures. Occupancy sensors and new lighting controls will be provided throughout the entire building.