Specifications include, but are not limited to: 1. Remove existing above-ground equipment. 2. Insert a camera into the well to inspect well. 3. Scrub and bail well. 4. Install new pump system including: A. 4” Submersible pump end B. Three phase submersible motor C. 2” PVS SCH 120 Drop pip with stainless steel coupling D. 10/3 Flat submersible cable with ground flomatic 2” stainless steel check valve E. 8" x 2” Well Seal F. 2 storage tanks G. Electrical repair package H. All necessary stainless-steel fittings 5. Pour concrete 6’ x 6’ x 6’ pad. 6. Perform start up, adjustments, and monitoring of system operation. 7. Labor, equipment & materials to sandblast & coat internally on one 12’x12’ welded tank with three coats of an AWWA D103 approved two-part epoxy coating with each coat having a 4 to 7 mill wet coverage, 15 to 18 mills dry coverage for the three coats.\ 8. Install Water Softener Filtration System With Brine Tank And 9" x 40" Sediment Filter 9. Install Luminor UV Filter 1.5" MPT 220V For Flow Rated 78/40/31 GPM 10. Install Steel Enclosure For Filtration System 11. Install Plumbing Package 12. Install Electrical Package 13. Properly dispose of any debris, packing and equipment as per County regulations, and ensure that area is clean and in a safe condition at all times. 14. Provide manufacturer’s product warranty at completion of project as well as warranty workmanship for a period of 1 year.