Specifications include, but are not limited to: A. Remove and dispose of the existing furnace unit according to federal, state, and local regulations. B. Install one (1) new commercial grade Lennox down flow furnace unit (Model ML180DF090E48B), or equivalent, including fan and all other parts, fittings, and rebuild kits to connect to the existing piping if needed. C. New unit shall connect to existing duct work, gas line, electrical and venting. D. Where applicable, Contractor is to seek any public utility rebates and pass the cost savings on to the California Highway Patrol. E. Contractor shall start-up and test unit to ensure proper operation and to make any adjustments needed. F. Contractor shall provide on-site training to CHP staff on the operation and functions of the newly installed furnace unit. G. Contractor shall provide two copies of Operation and Maintenance Manuals to the CHP on-site contact. H. Contractor is responsible for obtaining any permits required for the installation of the furnace unit. I. Contractor shall remove all debris, including packaging materials from the jobsite daily. J. Contractor shall warranty work for a period of one year after installation and provide manufacturer’s warranty on equipment installed.