Specifications include, but are not limited to: A. Assembly and installation of a GOULDS short, coupled W/L Turbine Model: 9WALC WL. 5 stages W/L 6” Bell Galvanized Strainer. 6” Discharge head packing gland, 1.00 Head shaft column assembly. B. Removal of the existing pump from current location. C. Replacement Skid pan pump should produce at an acceptable pressure grade or higher. D. Maintain a safe working environment to prevent injuries to CHP personnel or damage to CHP property. E. Contractor shall be responsible for any repair due to any damage cause by Contractor or any of his/her workers. F. Contractor shall keep the work site clean and haul away any work site debris. All material removed must be recycled where possible. G. Contractor shall warranty all parts and workmanship for a period of one (1) year. Contractor to supply the manufacturer’s warranties and manuals for any part used in this project. H. After project begins, project must be completed within thirty (30) days.