Specifications include, but are not limited to: A. Work Included: Demolition and removal work required for construction and connecting new Work to existing building and for reconstructing existing building. Work also includes barricades, temporary protection, dust protection, removal from site trash and debris from demolition work, and repairing existing hardscape/softscape damaged during the course of the work. B. Extent of selective demolition work is generally indicated on drawings. Selective demolition not shown on the drawings may be determined by examination of existing facilities and the proposed new and remodeled [ reconstructed ] work. Existing items not shown on the plans of proposed work and preventing the execution of proposed work are in the scope of the selective demolition work. C. Refer to the mechanical and electrical and plumbing drawings for extent of demolition work required in adjacent areas for accommodation of renovation work. If no drawings show the extent of demolition, the Contractor must determine the extent of work and include it in his scope of work. D. Degree of patching to be performed in a given area will be determined by the proposed new finish of that area. E. Disconnecting, removal and/or relocation and reconnecting of existing mechanical, electrical and fire protection work including equipment, piping and wiring are included in this Contract.