Specifications include, but are not limited to: preliminary engineering and plan development services necessary to produce construction contract documents for the listed project in accordance with INDOTs designated letting schedule. The selected firm will also be responsible for: Environmental Document (CE), Environmental Permits, Topographic Survey, Geotechnical Engineering, Roadway and MOT Design and Plan Development, Utility Coordination, Small Structure and Pipe Hydraulic Design, and Construction Phase Services. Other services such as Ecological Surveys, Wetland Mitigation, archeological investigations, historical/architectural investigations, and Subsurface Utility Exploration (SUE) may be included later if these work types become necessary.